Decking Construction

A Quality Decking Feature is an

extension of your home

The Under-construction foundation work is always hidden by the finished decking. Therefore it is of utmost importance that the base is engineered to last. We specialize in the formation of the base which is is approx ’70% of the whole project.

Pressure Treated Timber

6” x ”2 x or 4”x2 timbers are used to create a solid base using galvanized heavy duty angle brackets and coach bolts which are dipped in grease before assembly.

Damp Pevention

Before the decking is laid the sub-frame is checked and double checked for absolute rigidity !! If the sub-frame does not move then it certainly won’t move once the decking is fastened. Please note the entire decking area is not fastened to any exterior walls and is completely standalone so no water can possibly seep into your property.

Quality Engineered

All our projects are made with over 2000 fixings for a typical 5 meter by 4 meter decking area, with cross sectioned frame. The base is further structured with 4” x 4”  tanalised treated posts inserted into concrete ensuring that the timber base frame will be above ground level for air circulation. Landscape fabric (membrane) covered with shingle for weed control
© ahgardens.co.uk  2016 All Rights Reserved Designed and Hosted by AH Marketing
Decking Specialists
TEL: 01489 79 65 79 E-Mail: info@ahgardens.co.uk
web
counter

Chandlers Ford - Colden Common - Twyford - Shedfield - Wickham - Hedge End  - Park Gate -  Warsash

Bishops Waltham - Boorley Green - Horton Heath - Curbridge  - Curdridge  -  Burridge  -  Sarisbury Green

Decking

Construction

A Quality Decking Feature is

an extension of your home

The Under-construction foundation work is always hidden by the finished decking. Therefore it is of utmost importance that the base is engineered to last. We specialize in the formation of the base which is is approx ’70% of the whole project.

Pressure Treated Timber

6” x ”2 x or 4”x2 timbers are used to create a solid base using galvanized heavy duty angle brackets and coach bolts which are dipped in grease before assembly.

Damp Pevention

Before the decking is laid the sub-frame is checked and double checked for absolute rigidity !! If the sub-frame does not move then it certainly won’t move once the decking is fastened. Please note the entire decking area is not fastened to any exterior walls and is completely standalone so no water can possibly seep into your property.

Quality Engineered

All our projects are made with over 2000 fixings for a typical 5 meter by 4 meter decking area, with cross sectioned frame. The base is further structured with 4” x 4”  tanalised treated posts inserted into concrete ensuring that the timber base frame will be above ground level for air circulation. Landscape fabric (membrane) covered with shingle for weed control
Decking Specialists
© ahgardens.co.uk  2016 All Rights Reserved Designed and Hosted by AH Marketing
web
counter